This article is printed verbatim from the Nov. 5, 1922 issue of the Bisbee Daily Review. The illustration is from the Mining and Scientific Press in 1917, where it accompanies a far more technical article about the process.
Tin cans and scrap iron are the best copper “miners” in the Warren District. Working 24-hour shifts and drawing no pay, they are each year producing around 100,000 pounds of copper for the Copper Queen branch of the Phelps Dodge Corporation.
The story of the “tin can miners” starts down in the 400 level of the Czar shaft. Here the mine water that percolates through the old stopes and broken ground is strong in copper sulphate, running as high as 5 1/2 pounds of copper to every 1,000 gallons of water.

The water has extremely corrosive properties and special pumps and pipes are required to handle it. Ordinary pumps and pipes would soon be eaten apart.
Pipes are lined with wood
To convey the water from the pump on the 400 level to the surface, eight-inch steel pipe, lined with wooden strips, is used. The wooden lining keeps the water from eating the pipe. At the pump station, duplicate sets of pumps are kept ready at all times to handle the water in case the pump in action should break down.
Were the water not pumped continually, it would rapidly back down, and eventually reach the underground workings of the Calumet & Arizona’s Junction mine, approximately a mile away. The water at the Junction is not strong in corrosive properties and the pumping equipment there is not of a special type for handling water high in copper sulphates.
The Junction mine water is used in the Junction power plant boilers. Should the copper water from the Czar ever reach the Junction shaft, it would soon eat away the Junction equipment, and if not stopped before reaching the boilers, would put the power plant out of commission.
For this reason, every precaution is taken by the Copper Queen, that the water from the Czar be kept under control at all times. Three shifts of pumpmen are employed to handle the underground flow.
Plungers are porcelain on metal
Many different bronze alloys have been tried out for pump plungers, but not one has been strong enough to resist the corrosive properties of water. The most satisfactory plunger yet put into the pipes at the Czar has been one of a metal frame, with a porcelain lining exposed to the water.
When the water is driven from the special pumps, through the wooden-line steel pipe to the surface, it is conveyed through a wooden launderer to the precipitation plant, near the Sacramento shaft.
During the first six months of this year, 16,500,000 gallons of this water have been conveyed from the Czar to this plant. At the precipitation plant the water runs over tin cans and scrap iron placed in huge troughs.

Precipitating vats and launders at the Bisbee mines.
The copper sulphate attacks the iron (the cans and scrap) and a chemical reaction follows in which iron sulphate is formed. This iron sulphate goes away in solution in the waste water and native copper is precipitated.
What practically happens is this: the copper sulfate in the water eat away the cans and scraps and deposit natural copper for the tin and iron that is taken away. The cans and scraps retain their original shape, but change from tin and iron to copper.
Periodically, the copper is knocked from the bigger pieces, the “sludge” is dug up, dried and shipped to the smelter at Douglas. The copper recovered from the water at the precipitation plant is technically known as “cement copper,” and assay about 50 percent.
During the first six months of this year, 155 tons of tin cans and 47 tons of scrap iron were placed in the troughs at the plant.
During the rainy season, the “tin can miners” work harder, for more water seeps into the Czar. The efficacy of the precipitation plant is proven by the fact that 78% of the copper in the water is recovered.